The start up of the construction of the newest project in the field of Car Logistics took place at the end of summer. A hyper-modern vehicle logistics centre will complete the existing infrastructures by the end of 2012. The heart of the new building will be a 7000m² preparation centre for new-built cars with an integrated washing facility, a huge number of jobs for he mechanical and optical preparation of cars, as well as assembly lines for equipment and conversions of fleets and vehicle series. Moreover, a large car-parts and tyres warehouse will be created, and additionally 6 more Park-decks on the higher stages of the building will extend the possibilities for covered parking by about 2000 places.
The new facility will enable us to offer even more tailor-made and cost-saving services to our customers. Improved connectivity between working stations, shorter transiting thanks to the central position of the new-built car places and the various workshops ensure an efficient and resource-saving way of working.
In connection to these synergies, the use of alternative energies and state of the art technologies, a significant contribution to a more clean environment is being realized.

